Jump to content

Batey-Bould is back open!

Recommended Posts

All of Batey-Bould is open again after PANTRA finished rebuilding two more bridges over the weekend.  We were also able to do a lot of tread work and remove a lot of exposed rebar and spikes to make the other bridges that still need replaced a little bit safer until we can replace them too.

3 bridges down and 9 more to go.  We won't be getting the other 9 done this year though. :rolleyes:

59c96b4027709_CPBridge.jpg.5219d0c371e67e8f787338eb6d822197.jpg

  • Like 7

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Reply with:


×