Jump to content
Sign in to follow this  

first Bottom end rebuild

Recommended Posts

i recently bought a 1999 Rm 250 and i think im gonna start buying parts to rebuild the bottom end. I have the ability to do it (im mechanically inclined) along with the manual of course. im gonna send out the cylinder out to millenium technologies to be replated along with a new top end. so basically i want a brand new motor. i will be buying all of the necessary tools to do the bottom. but i was wondering if anybody could help me out on a parts list for the bottom.

Share this post


Link to post
Share on other sites

I got this when I did mine, also I bought more than you probably need :)

new crank bearings

moose complete gasket set + oil seals

new hot rods connecting rod kit

new power valve governor assembly

new water pump assembly

new clutch basket + plates

every bearing in the engine

new transmission counter shaft

checked the shift forks, drum, and gears

new piston and rings

clean the power valve assembly

That's about all I can remember

Share this post


Link to post
Share on other sites

good luck with your rebuild will u post a video or pictures once shes running? i was going to do the bottom on my rm 125 but sent it off for repair instead:)

Share this post


Link to post
Share on other sites

yeah im going to be taking alot of pictures to help with the assembly but it probably wont take place until late summer......im just buying the parts slowly as money allows until i have all of the parts (and some extra money incase i find any suprises)

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Reply with:

Sign in to follow this  

×