Jump to content
Sign in to follow this  

Washington Little Naches Road Construction

Recommended Posts

The Naches Ranger District will be fixing the Little Naches road 1900 at mile post 5.0 where it is reduced to 1 lane and will be replacing a culvert about 1 mile past this site at Pile Up Creek.

Construction will close the road from about 7am to Noon and then 12:15pm to 5pm on week days July 16 to August 15 to fix the one lane section.

The road will be closed for up to 5 days while the contractor replaces the culvert during this same time frame. This will be a complete closure for up to 5 days. The dates will be posted when the contractor summits his schedule to the district.

July 15th to August 15th is the in water construction window for the Little Naches River.

All the camping from Longmire Meadow (near the fish latter) to hwy 410 will still be open.

All the trails will still be open.

Thank you for your patience.

Share this post


Link to post
Share on other sites

that means if you stage at Taneum and drop down into the Naches that you will have it all to your self. Nice.

That means there will 400 rv's in Longmire Meadow :smirk:

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Reply with:

Sign in to follow this  

×
×
  • Create New...